Search results: Post
1049.2kWp Rooftop Solar Power System for Factory Building
The 1049.2 kWp rooftop solar power project at a factory in Thanh Hoa commune, Can Tho city, was implemented to optimize electricity supply for production, reduce operating costs, and improve energy efficiency for the business. The system utilizes AXITEC AXIworldpremium XL HC-430MH/144V solar panels combined with an SMA 110kW inverter, providing stable power generation and high operational durability.
330kWp Rooftop Solar Power System for Factory Building
The 330 kWp rooftop solar power project at a factory in Thanh Hoa commune, Can Tho city, was implemented to optimize electricity supply for production, reduce operating costs, and improve energy efficiency for the business. The system utilizes AE Solar. công suất 580w. N-Type Topcon solar panels combined with an SMA 110kW inverter, providing stable power generation and high operational durability.
90kWp Rooftop Solar Power System for Warehouse
The 90 kWp rooftop solar power project at the fertilizer factory was implemented to optimize electricity supply for production, reduce operating costs, and improve energy efficiency for the business. The system is designed to be integrated and suitable for the specific operation of the industrial plant and its sustainable development orientation.
TURNKEY DESIGN & CONSTRUCTION OF STANDARD LOGISTICS WAREHOUSES
High-standard design and construction services for distribution centers and logistics warehouses. We strongly focus on super-flat concrete flooring systems, natural ventilation solutions, and absolutely safe automatic fire prevention systems to continuously accommodate heavy cargo flow.
PRE-ENGINEERED STEEL FRAME INDUSTRIAL FACTORY GENERAL CONTRACTING
Turnkey construction solutions for industrial factories using pre-engineered steel structures. Applying modern CNC fabrication technology, our projects ensure large clear spans, optimal machinery layout space, high load-bearing capacity, and significantly reduced operational deployment times.
GENERAL CONTRACTOR FOR GARMENT FACTORY CONSTRUCTION
The general contractor for the construction of the 2,513m² garment factory implemented a comprehensive construction solution from foundation and steel structure to technical systems, ensuring quality, progress, and optimized investment costs.